DX
"Next-Generation Engineering Driven by DX – Our Challenge for a Sustainable Future"
Organization
dx
Mission
Introduce Digital Transformation by using latest technology for enhance competitiveness.
Develop and implement suitable DX tools and upgrading/transforming our operation workflow.
Cultivate stakeholders for further transforming and promoting toward DX.
TNS DX
"Next-Generation Engineering Driven by DX – Our Challenge for a Sustainable Future"
Why IPMP system
is Longed in TNS?
01
To improve Construction productivity, Construction Work Packaging (CWP) shall be established by using AWP method in IPMP.
02
All EPC data shall be integrated in IPMP to use CWP constraint management prior to commencement CWP.
03
CWP constraint shall be managed for Construction resources optimization (Just in Time) to maximize productivity.
IPMP SYSTEM
Integrated Project Management Platform
ID TAG System
Why ID Tag System is Longed in TNS?
ID Tag System
Why ID Tag System is Longed in TNS?
01
To improve Site progress control, Fabricated products status shall be traced properly and quickly.
02
The products status shall be integrated to IPMP system for timeless CWP constraint management.
03
The system shall be online for eliminate unnecessary paper work, duplicate data key-in work, time lag between work/inspection.
Internet of Things
Why loT is longed in TNS?
01
To maximize important asset performance, sensing and visualization of asset are needed for further analyze performance.
02
loT information can be used to making safe work and quality work.
Internet of things
Why IoT is Longed in TNS?